Check SolveTORONTO in Toronto →

Track Your Report

Enter your SolveTO reference (STO-A3F7K2) or your city 311 reference number.

← Previous issue
Next issue →

Past Toronto's published service standard

This report is 41 days old. The city's standard for Water Drainage is 1 days. Councillors are the right escalation when 311 is past its own deadline.

Email Cllr. Dianne Saxe
report photo

Flooded street, blocked drainage

ref: STO-E3Z5J7
city ref: 09146560 Track on 311
Water Drainage Snap City acknowledged
Open 41 days
Toronto Water: 1 days

503 College Street, Toronto Toronto

Reported on Thu, Apr 16, 2026 at 7:54 AM · 1mo ago

Report Details

AI-generated, reviewed by reporter

A large standing water pool approximately 4m x 2m is pooled on the street at the curb and sidewalk intersection, extending into the traffic lane due to what appears to be a blocked storm drain system. The road surface shows visible cracking and asphalt deterioration with exposed concrete patches along the curb line, creating slip and tripping hazards for pedestrians and potential hydroplaning risks for vehicles.

Description

Road damaged

Community Updates

Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.

Have you seen this issue?

Sign in to report

Comments (0)

No comments yet. Log in to be the first.

Ward 11 · University-Rosedale

Get alerts for this ward

Nearby

School

King Edward Jr & Sr Public School

312m

School

Kensington Community School

332m

Bus Stop

College St At Euclid Ave

122m

Bus Stop

College St At Euclid Ave

141m

Park

Healey Willan Park

452m

Report History

Complete timeline of your report lifecycle

Report Submitted

Apr 16, 2026 at 7:54 AM

Road damaged

Email sent to Toronto 311

Apr 16, 2026 at 7:55 AM

Sent

Awaiting Response

Open for about 1 month

← Back to Reports