Past Toronto's published service standard
This report is 40 days old. The city's standard for Sidewalk Damage is 30 days. Councillors are the right escalation when 311 is past its own deadline.
Email Cllr. Ausma Malik
Lake Shore Boulevard West Toronto
Reported on Fri, Apr 17, 2026 at 9:38 AM · 1mo ago
Report Details
AI-generated, reviewed by reporter
A large concrete curb section has collapsed into an adjacent landscaped area on Lake Shore Boulevard West, creating a gap and uneven surface between the functional sidewalk and the broken section. The fractured concrete has settled below grade, exposing soil and forming an unstable edge that presents a tripping hazard and accessibility issue for pedestrians.
Community Updates
Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.
1 community report
✓ Fixed · Duplicate report · Apr 20
Have you seen this issue?
Sign in to reportWard 10 · Spadina-Fort York
Nearby
School
Bishop Macdonell Catholic Elementary
School
Jean Lumb Public School
Bus Stop
Queens Quay Loop At Lower Spadina Ave
Bus Stop
Spadina Ave At Queens Quay West North Side
Park
Spadina Quay Wetlands
Report History
Complete timeline of your report lifecycle
Report Submitted
Apr 17, 2026 at 9:38 AM
Email sent to Toronto 311
Apr 17, 2026 at 9:50 AM
A community member reported: It's fixed
Apr 20, 2026 at 11:39 AM
Duplicate report
Awaiting Response
Open for about 1 month
Similar Reports
Dead rodent on sidewalk
Gardiner Expressway, Harbourfront-CityPlace, Toronto
1mo ago
Corroded waterfront safety railings
Queens Quay West, Toronto
1mo ago
Deteriorated waterfront dock decking
Waterfront Recreational Trail, Harbourfront-CityPlace, Toronto
1mo ago
Graffiti tags on Spadina underpass
Iceboat Terrace, Toronto
1mo ago
Encampment being established underpass
Spadina Avenue, Toronto
1mo ago
Extensive graffiti on hoarding structure
Iceboat Terrace, Toronto
1mo ago
Comments (1)
Duplicate with more accurate location info