Check SolveTORONTO in Toronto →

Track Your Report

Enter your SolveTO reference (STO-A3F7K2) or your city 311 reference number.

← Previous issue
Next issue →

Past Toronto's published service standard

This report is 34 days old. The city's standard for Sidewalk Damage is 30 days. Councillors are the right escalation when 311 is past its own deadline.

Email Cllr. Chris Moise
report photo

Curb edge sidewalk damage

ref: STO-O1I2S1
city ref: 09194586 Track on 311
Sidewalk Damage Snap City acknowledged
Open 34 days
Transportation Services: 30 days

City service request (311)

New

Updated about 1 month ago

The lines below are from the City of Toronto's acknowledgement email. They are estimates from the city, not a guarantee of when the issue will be fixed on the ground.

Your Reference Number: 09194586 Service request type: Road Pothole / Road Damage Expected service delivery: 2026-05-07, 11:05 p.m. Estimated resolution timeframe: The service request will be resolved within 14 days. Service address (city record): 91 Parliament St

91 Parliament Street, Moss Park, Toronto Toronto

Reported on Thu, Apr 23, 2026 at 3:25 PM · 1mo ago

Report Details

AI-generated, reviewed by reporter

The sidewalk and curb edge at this location have cracked, sunken, and deteriorating asphalt with multiple sections of exposed or missing concrete and loose debris along the curb line. The uneven surface and missing asphalt chunks create a serious tripping hazard for pedestrians, particularly where the sidewalk meets the street.

Community Updates

Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.

Have you seen this issue?

Sign in to report

Comments (0)

No comments yet. Log in to be the first.

Get alerts for this ward

Nearby

School

Liberty Prep School

275m

School

St Paul Catholic Elementary School

317m

Bus Stop

King St East At Parliament St

14m

Bus Stop

Parliament St At King St East

16m

Park

Little Trinity Church Lands

84m

Report History

Complete timeline of your report lifecycle

Report Submitted

Apr 23, 2026 at 3:25 PM

Email sent to Toronto 311

Apr 23, 2026 at 10:52 PM

Sent

Awaiting Response

Open for about 1 month

← Back to Reports