Road Damage in Ward 14 — Toronto-Danforth
10 road damage reported in Ward 14. 3 resolved (30.0%). Avg resolution: 5.4 days.
10
Total Reports
3
Open
3
Resolved
30.0%
Resolution Rate
Recent Reports
Road Damage at Carlaw Avenue
Cracked asphalt around storm drain
Heaved road patch creates trip hazard
Large pothole with standing water
Cracked asphalt around catch basin
Streetcar track road deterioration
Road damage near streetcar tracks
Extensive road subsidence near catch basin
Missing crosswalk paint school zone
Missing crosswalk paint at Eastern Ave and Morse St. This is in a school zone. There is heavy tra...
Extensive road surface deterioration
Severe asphalt cracking on Carlaw
Between lakeshore and Queen st on Carlaw
Spot a road damage in Ward 14?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now