Road Damage in Ward 14 — Toronto-Danforth
9 road damage reported in Ward 14. 3 resolved (33.3%). Avg resolution: 5.4 days.
9
Total Reports
2
Open
3
Resolved
33.3%
Resolution Rate
Recent Reports
Cracked asphalt around storm drain
Resolved
May 14, 2026
Heaved road patch creates trip hazard
Acknowledged
May 13, 2026
Large pothole with standing water
Acknowledged
May 13, 2026
Cracked asphalt around catch basin
Acknowledged
May 13, 2026
Streetcar track road deterioration
Road damage near streetcar tracks
Resolved
May 06, 2026
Extensive road subsidence near catch basin
Resolved
Apr 29, 2026
Missing crosswalk paint school zone
Missing crosswalk paint at Eastern Ave and Morse St. This is in a school zone. There is heavy tra...
Acknowledged
Apr 27, 2026
Extensive road surface deterioration
Sent
Mar 31, 2026
Severe asphalt cracking on Carlaw
Between lakeshore and Queen st on Carlaw
Sent
Mar 25, 2026
Spot a road damage in Ward 14?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now