Road Damage in Ward 2 — Etobicoke Centre
20 road damage reported in Ward 2. 1 resolved (5.0%). Avg resolution: 7.8 days.
20
Total Reports
10
Open
1
Resolved
5.0%
Resolution Rate
Recent Reports
Parking lot surface heavily damaged
Hard to see on the attached picture...but the parking lot is full of small depressions ... Its te...
Cracked, spalling sidewalk
Sidewalk cracks and trip hazard
Extensive road surface damage and settling
Severe asphalt cracking and spalling
Multiple potholes in residential street
Long driveway crack pattern
Road surface alligator cracking near curb
Severe asphalt cracking on street
Deteriorated pedestrian crosswalk markings
Road surface cracks in asphalt
Ludstone and Arkley crescent
Cracked and spalling sidewalk
Spot a road damage in Ward 2?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now