Past Toronto's published service standard
This report is 19 days old. The city's standard for Road Damage is 14 days. Councillors are the right escalation when 311 is past its own deadline.
Email Cllr. Stephen Holyday
Severe asphalt cracking and spalling
18 Moford Crescent, Willowridge-Martingrove-Richview, Toronto Toronto
Reported on Fri, May 8, 2026 at 2:36 PM · 18d ago
Report Details
AI-generated, reviewed by reporter
The asphalt road surface shows extensive deterioration with alligator cracking, spalling, and multiple missing sections exposing the dark base material and subgrade, along with a continuous longitudinal crack running the length of the road. This structural failure creates tripping hazards and requires resurfacing or patching to prevent further deterioration and water infiltration.
Community Updates
Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.
Have you seen this issue?
Sign in to reportWard 2 · Etobicoke Centre
Nearby
School
Ecole Elementaire Felix Leclerc
School
Transfiguration Of Our Lord Catholic Elementary School
Bus Stop
Kipling Ave At Learmont Dr
Bus Stop
Kipling Ave At Hayhurst Rd
Park
Martingrove Gardens Park
Report History
Complete timeline of your report lifecycle
Report Submitted
May 08, 2026 at 2:36 PM
Email sent to Toronto 311
May 08, 2026 at 2:36 PM
Awaiting Response
Open for 19 days
Similar Reports
Extensive road surface damage and settling
5 Moford Crescent, Willowridge-Martingrove-Richview, Toronto
18d ago
Large pothole with crumbling edges
2 Moford Crescent, Toronto
2mo ago
Sunken road with alligator cracking
Sabrina Drive
18d ago
Long linear road surface crack
1 Hayhurst Road, Toronto
2mo ago
Cracked sidewalk near Kipling Ave
Hayhurst Road
25d ago
Multiple potholes in residential street
73 Breadner Drive, Willowridge-Martingrove-Richview, Toronto
18d ago
Comments (0)
No comments yet. Log in to be the first.