Check SolveTORONTO in Toronto →

Track Your Report

Enter your SolveTO reference (STO-A3F7K2) or your city 311 reference number.

← Previous issue
Next issue →

Past Toronto's published service standard

This report is 19 days old. The city's standard for Road Damage is 14 days. Councillors are the right escalation when 311 is past its own deadline.

Email Cllr. Stephen Holyday
report photo

Severe asphalt cracking and spalling

ref: STO-N5W9X2
city ref: 09294464 Track on 311
Road Damage Snap City acknowledged
Open 19 days
Transportation Services: 14 days

18 Moford Crescent, Willowridge-Martingrove-Richview, Toronto Toronto

Reported on Fri, May 8, 2026 at 2:36 PM · 18d ago

Report Details

AI-generated, reviewed by reporter

The asphalt road surface shows extensive deterioration with alligator cracking, spalling, and multiple missing sections exposing the dark base material and subgrade, along with a continuous longitudinal crack running the length of the road. This structural failure creates tripping hazards and requires resurfacing or patching to prevent further deterioration and water infiltration.

Community Updates

Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.

Have you seen this issue?

Sign in to report

Comments (0)

No comments yet. Log in to be the first.

Get alerts for this ward

Nearby

School

Ecole Elementaire Felix Leclerc

175m

School

Transfiguration Of Our Lord Catholic Elementary School

279m

Bus Stop

Kipling Ave At Learmont Dr

224m

Bus Stop

Kipling Ave At Hayhurst Rd

233m

Park

Martingrove Gardens Park

336m

Report History

Complete timeline of your report lifecycle

Report Submitted

May 08, 2026 at 2:36 PM

Email sent to Toronto 311

May 08, 2026 at 2:36 PM

Sent

Awaiting Response

Open for 19 days

← Back to Reports