Check SolveTORONTO in Toronto →

Track Your Report

Enter your SolveTO reference (STO-A3F7K2) or your city 311 reference number.

← Previous issue
Next issue →

Past Toronto's published service standard

This report is 19 days old. The city's standard for Road Damage is 14 days. Councillors are the right escalation when 311 is past its own deadline.

Email Cllr. Stephen Holyday
report photo

Failed utility patch with cracking

ref: STO-N9H3T6
Road Damage Snap Report sent
Open 19 days
Transportation Services: 14 days

14 Ludstone Drive, Willowridge-Martingrove-Richview, Toronto Toronto

Reported on Fri, May 8, 2026 at 2:22 PM · 18d ago

Report Details

AI-generated, reviewed by reporter

Road surface at 14 Ludstone Drive shows severe radial cracking with a sunken circular patch indicating structural failure beneath the asphalt, likely from a failed utility repair, creating an uneven and potentially hazardous surface. The nearby aging sewer infrastructure (catch basins averaging 70 years old) suggests underlying utility issues may be contributing to the subsidence.

Community Updates

Has this issue been fixed? Come back and share an update with a photo. Your before-and-after helps track what's working.

Have you seen this issue?

Sign in to report

Comments (0)

No comments yet. Log in to be the first.

Get alerts for this ward

Nearby

School

Transfiguration Of Our Lord Catholic Elementary School

378m

School

Ecole Elementaire Felix Leclerc

441m

Bus Stop

Martin Grove Rd At Waterbury Dr

284m

Bus Stop

Martin Grove Rd At Waterbury Dr

290m

Park

Martingrove Gardens Park

297m

Report History

Complete timeline of your report lifecycle

Report Submitted

May 08, 2026 at 2:22 PM

Email sent to Toronto 311

May 08, 2026 at 2:23 PM

Sent

Awaiting Response

Open for 19 days

← Back to Reports